Contracted to perform all cast in place concrete
work for the superstructure of a new hotel/casino. Construction consisted of a
55 storey cast-in-place structure. A post tensioning system was adopted in the
floor, tying into the elevator cores that consisted of 12 elevators within the
area.
|